Toolbox

Lieper Bridge, Niederfinow, Germany

Replacement construction of a steel composite bridge

Scope

The Lieper Bridge project involved the replacement of an existing bridge with a steel composite structure featuring a prefabricated superstructure. The construction concept was designed to ensure efficient execution while maintaining uninterrupted use of the adjacent waterway.

BrandSafway supported the project with a custom-engineered formwork and access solution, enabling in-situ concrete works for the abutments and superstructure while minimising impact on shipping traffic and site logistics. 

Challenge

A key challenge of the project was the need to carry out concreting works without obstructing shipping traffic. This required a construction method that allowed the superstructure to be completed quickly and safely, while working within the limited space available above the waterway.

In addition, the formwork solution had to accommodate a prefabricated bridge deck concept for efficient logistics, while providing safe access and fall protection for crews during assembly, concreting and striking operations. The integration of multiple systems into a single, coherent solution was essential to meet these requirements.

Performance

A bespoke cantilevered formwork solution based on the INFRA-KIT modular system was developed for the construction of the abutments and the in-situ concrete sections of the superstructure. The superstructure formwork consisted of 3 m (10 ft) wide standard elements, each equipped with two INFRA-KIT brackets, timber girder formwork and the PROTECTO® fall protection system, ensuring both structural reliability and a high level of safety.

The prefabrication of bridge decks simplified logistics and enabled efficient site operations. The superstructure was concreted in a single cycle, significantly reducing construction time and allowing shipping traffic to continue without interruption. Shuttering and striking operations were carried out using a scissor lift mounted on a floating pontoon, providing flexible and safe access directly from the water.

Gern unterstützen wir Sie bei Ihrem nächsten Projekt! Wir freuen uns über Ihre Kontaktaufnahme.

Kontaktieren Sie uns
huennebeck logo

msg

huennebeck logo

Herzlichen Dank. Ihre Bewerbung wurde erfolgreich übermittelt.

Projekt downloaden

Select language